In my previous post I described the creation of an Oracle Database. This procedure assumes the presence of both the Grid Infrastructure and Oracle Database software.
The Provision Oracle Database Deployment Procedure takes care of all of this, so installing the Grid Infrastructure software and configuration, installing the Oracle Database software and the creation of the Database!
Provision Oracle Database using EM 12c
Filed under: Cloud Control 12c, Oracle Enterprise Manager 10 - 11g - 12c, Provisioning, White Papers, Cloud Control, em12c, enterprise manager cloud control, oem 12c